MMT's products are positively impacting companies worldwide in a select group of industries, including:
Medical
Pharmaceutical
Domestic Appliance
Optical Instruments
Food Processing
3D printer
Environmental Protection
Instruments and Meter
Automotive
Engineering Machinery
Sea Angling
General Manufacturing
Q: What are your lead times?
A: Normally samples in 30-60 days and production in 60~90 days, mould 60~120days once receive the order. The complexity of the part, or the tooling used to make the part, will affect the lead time.
Q: What about quality standards and inspections?
A: MMT have our own quality control department which can meet most your inspection and quality standards, and if needed we can use a 3rd party inspection service. Each production lot will come standard with a dimensional inspection report and material certification. Additional documentation, if requested, can be provided. We will guarantee the parts to meet or exceed your drawing standards.
Q: I have never worked with China, How do I get started?
A: Provide us with dimensional drawings, 3D(if necessary), Sample(if necessary),lot quantities, package instruction,folowing up MMT's OPL to clarify some technical issue,then MMT will do the rest.
Q: Can we visit MMT supplier in China?
A: MMT encourage our customers to visit the factories and participate in the supplier qualification process. Once a confidentiality agreement is signed we provide you with all the factory information.